MuhammadFaheemMustaqee
Member
- Location
- Ras tanura
- Occupation
- Electrical inspector
If a transformer oil sample test was conducted during the Site Acceptance Test (SAT) but the transformer has remained de-energized for over six months, should another oil sample test be performed to check for potential contamination