Davebones
Senior Member
- Location
- North Of Tampa Fl
Had a contractor in our plant for bathroom remodel . 208 v panel with Category rating of 3 on the panel. Needed to tie -in a 60 amp feed for hot water heaters . Told the outside Electrican I would do this early in the morning when I could shut down power to the panel . His response was " We would never get anything done on the outside " if we worked like that . Older commerical Electrician and a helper with him . Sad to say but I hear the same from other electricans around this area .