LarryFine said:Here's one from a small job we're doing right now:
Older existing building, all brick, no access to CEE (if there is even rebar at all), new all-plastic plumbing, connection to fire-sprinkler system not permitted.petersonra said:ground rods? no CEE?
The service from the existing gutter box comes straight from the light company's transfomer 12470 v primary and 120/208 three phase secondary, each tranformers is rated at 50 kva, out of the gutter box there no CT can and there will only be 1 meter socket @ 320 amp and then there will be a 400 disconnet fused at 320 amps which will be feeding 2 ea. 200 amp load centers. No panel schedule Im still trying to wing that one .RUWIREDRITE said:Nomad,
Need a couple things,
Size of main service feeding this existing gutterbox.
Is there a ct cabinet also? and metering?
As i see it ,your new 400 amp switch fused at 320 will be feeding what?
Perhaps a 40 circuit- 3 phase- 120/208 volt 400 amp panel?
Also what is coming from this new distribution panel, maybe a panel schedule will help if you have.
I just want to know all the pieces of the puzzle so i don't mis-inform you with a diagram.
Patricia (my better third) did these drawings from scratch with Paint Shop Pro. Want to see more, like the rear elevation, panels scehdules, etc?Dnkldorf said:Larry, what program is that?