Is it acceptable to run from a meter on the outside of a building to the tenant space, hit a disconnect, then a wiring gutter, and finally branch off to two panels?
I think it is but just wanted to triple check as I don't do a lot of work with tenant metering and such.
EDIT; Is it ok if the disconnect is on the outside next to the meter?
Thanks!!
Keri
I think it is but just wanted to triple check as I don't do a lot of work with tenant metering and such.
EDIT; Is it ok if the disconnect is on the outside next to the meter?
Thanks!!
Keri