An existing building getting renovated has a thick 1.7 foot concrete wall dividing the two parts of the building.
The existing setup is... two different services, one to each of the two parts.
For the new renovation however, on one of the upper floors, the thick 1.7 foot concrete wall will be cut and this particular floor will have the two building parts connected.
Will be easier to understand from the pics below:
I'm not sure whether to keep the two separate services or combine to one service.
The existing setup is... two different services, one to each of the two parts.
For the new renovation however, on one of the upper floors, the thick 1.7 foot concrete wall will be cut and this particular floor will have the two building parts connected.
Will be easier to understand from the pics below:
I'm not sure whether to keep the two separate services or combine to one service.