One worker or two

Status
Not open for further replies.

jimbo123

Senior Member
When is it required by 70e to have two qualified workers or two electricians to be together doing an electricial job? I know we have to be safe but there are times people are sent on work by themselves.
Is it differrent for QW or electrician or are the rules the same for both? When it comes to electrical work there is a big difference between the electricians and the QW. Some of the QW think they are a electician now .
 

Volta

Senior Member
Location
Columbus, Ohio
Qualified workers and electricians are not mutually exclusive, nor automatically inclusive. What kind of "electrical job" would you have a non-electrician perform?
 

jimbo123

Senior Member
Most think they can do any electric work ,Right now they are disconnecting and connecting 3 phase motors . Trying to troubleshoot electrical problems with motor control and usually not sucessfull. Replacing 277volt ballast,replacing small vfd . They makesure power is off and remove and replace with same part. There was never any training besides classroom training .they were showed how use a voltage tester.
 

zog

Senior Member
Location
Charlotte, NC
When is it required by 70e to have two qualified workers or two electricians to be together doing an electricial job? I know we have to be safe but there are times people are sent on work by themselves.

Only requirement like that you will find is in OSHA for systems >600V

Is it differrent for QW or electrician or are the rules the same for both? When it comes to electrical work there is a big difference between the electricians and the QW. Some of the QW think they are a electician now .

Your facility needs to look at the 70E training requirements, some classroom training and showing them how to use a meter not not make them a QP.
 

rt66electric

Senior Member
Location
Oklahoma
helps to have a buddy

helps to have a buddy

I normally work alone, but when I'm around "Stuff" over 240v or I if am not familiar with someones elses "dubious" prevoius work. I like to have a "warm-body" around who knows where the OFF button is . Two men one a simple project is not required -BUT- is good practice
 
Status
Not open for further replies.
Top