A buddy called me yesterday and said he got wrote up on a Large Pull Box that was installed for feeders. It was for a strait pull without a splice. I thought wow, dumb mistake, but then he told me the inspector counted the 8 times the diameter from where the fittings ended inside the box. 2" emt connector with a plastic bushing on the end sticks into the box a little bit. I was dumb founded and it took my breath away! I guess I have many, many installations that don't meet code!! He was really bumbed because it was going to take a bit of work as you guys can imagine to fix the situation. I feel bad for him as well, because I would have been in the exact boat.
Just trying to help other people out, hopefully everybody else has read the this article and has gotten it right!
Just trying to help other people out, hopefully everybody else has read the this article and has gotten it right!