Hey Guys , Have A Existing Condition Inside Lock Electrical Room.
Trying To Do A Part For Part Replacement Of Some Tired Main Gear. I Have Existing Tennet Sub Panel Mains Wiring Stubbing In From Celing , At Which The Wire Is Exiting The Raceway And Freewired Into The Meter Bank . This Is All Enclosed By A Metal Enclosure With Tapped And Screw Covers. I Am Being Told That This Is Not Acceptable , And That These Load Side Wires Need To Be Enclosed In There Own Raceways From The Meter Bank Connecting To The Stub Raceways ? Chapter 45 So Fl Building Code Has A Skirting Enclosure Drawing That Shows What I Have . Any Help ?
Trying To Do A Part For Part Replacement Of Some Tired Main Gear. I Have Existing Tennet Sub Panel Mains Wiring Stubbing In From Celing , At Which The Wire Is Exiting The Raceway And Freewired Into The Meter Bank . This Is All Enclosed By A Metal Enclosure With Tapped And Screw Covers. I Am Being Told That This Is Not Acceptable , And That These Load Side Wires Need To Be Enclosed In There Own Raceways From The Meter Bank Connecting To The Stub Raceways ? Chapter 45 So Fl Building Code Has A Skirting Enclosure Drawing That Shows What I Have . Any Help ?