Moore Power
Member
- Location
- Washington
- Occupation
- Electrical Contractor
I just want to get an idea of what other ECs do when it comes to putting boxes in demising walls on T.I. or shell build outs. I'm fairly new to the contracting side of this and I have been cutting up the demising walls on most of my jobs, and sometimes it's pretty time consuming. Most of my work is for national GCs who don't bring tools half of the time. Would it be strange to see an exclusion for opening existing walls in a proposal? Am I just being a baby? I don't like doing cut in boxes in a new building, or when the whole place is being demo'd. Any advice is appreciated.