We have switchgear that has a main breaker rated as a level 4 for ppe if you were to operate it. The feeder that needs to be racked out is listed as DANGEROUS after a arc flash survey. We open and close the breakers remotely . Now after opening this cb listed as DANGEROUS would the main switchgear breaker need to be opened before racking this to the disconnect or remove position ? There has not been any PM on gear in over 4 years or more. I would like to ask some of your opiniuns on how you would handle it. This would be fielded to electrical contractor.