cgood1976
Member
- Location
- el paso, tx
From the electric company transformer I have to o to an outdoor switchboard roughly 500' to switch board in building. Do I need to run all grounds ( i.e. metal frame, water pipe, and ufer ) to the outdoor main switchboard or can I hit the switchboard in building and be to code? The out door switch board also feeds a central plant building. Any help would be appreciated.