So your situation made me think if it's all plastic boxes, no ground anywhere, could you use that bare wire for the interconnect? Just a thought, I was wondering about that as well. still a hack job. Did the EI do a rouigh inspection?
Yes but not in detail. They don't go into the crawl or the attic, space. In my opinion the rough or the final inspection is worthless. I have already complained to one of the local cities but i have not heard back.
And your point is: That you did something wrong and got away with it, but it is someone else's fault because you were not caught?:?
And your point is: That you did something wrong and got away with it, but it is someone else's fault because you were not caught?:?
I never said i did the installation.
.
Here is what the customer did and i doubt the inspector saw it.
I thought he meant the homeowner or somebody else did the job, maybe Edward can clear that up, and how he found out about it.
No, you did not, I mis interpreted your post and I apologise.:ashamed1:
I missed this in your OP:
:slaphead::slaphead::slaphead:
Sorry.
I reread your post and I totally blew it.
Are you "positive" that it's 14-2. I started to call a guy on something like that the other day and turned out that it was flat 14-3, not round like I normally see.
As for the strapping and not climbing in the attic. Yeah, he should have looked at that.
I never said i did the installation.
I gave the customer a quote of installing new wiring and inerconnecting 5 smoke alarms. They said it is too much we will do it ourselves or have the GC do it. The inspection passed last week and today I had to go back to other work in the attic and that is what I saw they had done.
They (customer or GC) installed 2 conductor NM cable between the smoke alarms, no strapping, just all over the place. The inspector does not open up the junction boxes to see if the proper wiring type is installed, he doesn't check in the attic how the wiring is installed and the home owner got away with crapy work and he is happy that inspection is passed.
Does inspector know you did not do the installation? Maybe he did not look too hard because he saw some of your other work and figured you were competent enough he was not going to look at every detail of the installation. Had he known you did not do that part he may have made sure to look harder at that part of the job.
Here without a separate permit for that part of the job would have meant you would be the one that receives a correction notice had he caught it. You may be able to get out of it counting against you if you did not do the work, but no matter what you have a problem to deal with.
100 % positive it was a 2 conductor nm cable.
So, what is the code violation on this?