Has anyone ever run parallel feeds to an overhead service from the Edison pole? The cost and workability of parallel 3/0 runs instead of one 500 kmil run makes me want to run parallels. Does Edison have a problem with this? Please advise, thanks.
We're not allowed to touch Edison's pole except on underground. They, Edison, bring the drop from the pole to us and with a lot smaller conductors than we would ever supply.