Does anywhere in the NEC prohibit using parallel conductors to a weather head for a overhead service drop.
I have a single phase 120/240v multifamily dwelling and the customer already has 2/0 conductors. Can I just place them in parallel in a single conduit to a weather head and have the utility bring in a service drop. Will the inspector approve this?
I have a single phase 120/240v multifamily dwelling and the customer already has 2/0 conductors. Can I just place them in parallel in a single conduit to a weather head and have the utility bring in a service drop. Will the inspector approve this?