shadow
Member
- Location
- Massachusetts
Need help withthis one I'm doing a job where i need to run overhead wires from one pole to another pole over water to power lights in park. Arial cable is tryplex.I running 2 hots and insulated nuetral from meter up the pole and connecting insulated nuetral to bare wire on tryplex going back to meter with breakers.never did this before . cant find anything in code book .I think I'm doing it right but want to make sure Thanks for yourhelp you guys are the best . PS does anyone know what the going rate per hourfor statework in ma. is i just dont wantto get jipped by my boss. thanks .