industrial park with 120/240v 1Ph service, the service is a bunch of individual meter / mains fed from a trough. Feeder goes underground (pvc) from here to the panel in the unit. The feeder is 3 wire (H-H-N, no EGC), and there is a (GEC?) bonding this panel to a water pipe. Should the neutral bar be bonded to the can in the panel in the unit?