Please look at the panel schedule attached and tell me which side of the panel is correct based on the loads shown.
Ballast nameplate: 3.5A 480V
Thank you.
 

Attachments

  • TEST.compressed.pdf
    40.4 KB · Views: 0
Thank you gentlemen. I'm just a 70 year old retired master electrician (14 states) who thought he finally lost his mind.
Have an old client that still sends me drawings to review because he doesn't trust EE's. When I marked up the dwg's I reviewed and sent them back to the client he naturally questioned the EE and the EE said I was just an electrician and didn't know what I was talking about. (EE's on the left side, mine on the right) This is from the Senior EE partner of a major North Carolina Engineering firm who sealed the dwgs. There are 966 of these fixtures so you can easily see why all the electrical quotes were WAY out of the budget. Like I told the owner, in my 50 years of doing this, I've never seen a more incompetent set of electrical docs.
 
Status
Not open for further replies.
Top