codequestion
Banned
- Location
- MD, USA
Is there anywhere in NEC 2014 it says panelboard or switchboard shall not be overloaded and that demand and connected load calculation is required?
Sent from my SM-G935U using Tapatalk
Sent from my SM-G935U using Tapatalk