gsstaley@sbcglobal.net
Member
- Location
- Houston
If I have parallel 4/0 alum coming into a CT can (240v), am I allowed to leave that can into 2 separate disconnects, each with a 200a MCB, yet 1 switch 2' to the left and 1 switch 3' to the right. Shouldn't the entire 400a enter a service gutter 1st, then make taps into each disconnect?