mstrlucky74
Senior Member
- Location
- NJ
So NECA Manual Of Labor Units gives recommended labor unit discounts for parallel conduit runs. They also give the discounts for the wire run in the parallel runs. So there is a savings in pulling wire in parallel runs? Do you agree there is a time saving in the wire pulling as well? This have to do with reel setup? Thanks.
