Where is a grounding connection to be made for parallel generators feeding a paralleling switchboard;
- at generators, or
- at switchboard, or,
- at both?
What Code references are used for this situation?
Are the generators individually "another system" as referred to Article 100 for "separately derived system"?
There is no utility "service" involved.
The system voltage is 480/277V, 3 phase, 4 wire, wye.
The generator and switchboard operate as prime power, and are islanding.
- at generators, or
- at switchboard, or,
- at both?
What Code references are used for this situation?
Are the generators individually "another system" as referred to Article 100 for "separately derived system"?
There is no utility "service" involved.
The system voltage is 480/277V, 3 phase, 4 wire, wye.
The generator and switchboard operate as prime power, and are islanding.