No you can not run parallel GECs, there is no need to with a maximum size of 3/0Originally posted by wolfman56:
I'm installing a 500 amp. service. It feeds 9 meters from a main disconnect. It will have 2 masts running parallel.
Is it allowed to run 2 parallel grounding electrode conductors, (to the water main)?