I am working on a project at a multi-tenant building and we are adding service for a new tenant. The plan checker is asking me to provide a load study for the whole board not just the tenant.
Do I need to put a meter on the board main to determine the existing peak load or would the utility have that information?
Do I need to put a meter on the board main to determine the existing peak load or would the utility have that information?