05 NEC
sorry for the "silly" questions, just want to confirm-
have a pedestal with meter for lights in a parking lot. there is another pedestal (without meter) with 4 wire feeders, 40A main.
contractor connected grounds/nuetral bar with a jumper. these should be seperated, no?
also- ground rod is in place at both pedestals, however, contractor did not connect a GEC to second (the one without the meter) pedestal.
is this a seperate structure? this one seems a little "iffy" to me...
thanks!