liquidtite
Senior Member
- Location
- Ny
the forman on a job im on has three four inch holes that he core drilled going through the foundion,I noticed he didnt use any hydrolic cement or any type of sealant.IS it nessary to do so?wnt water come into the buildng the way he has it .his holes are tight to conduit but still.also he has a regular pullbox being burried flushed up to cover in cement dosnt the pb have to be rated in cement?