Thanks raider. I had someone call me about a photovoltaic system they are helping a EC with. The EC installed everything in schedule 40. Now apparently the conduits have shrunk out of the fittings leaving exposed wiring. Anyone have experience with this? I was looking at 690.31 (A) under the "FPN" . It talks about high temperatures for installation.
It doesen't surprise me as things tend to shrink when cooled and expand when heated.