jeramiepluemer
Senior Member
- Location
- Wisconsin
- Occupation
- Electrician
I install flex pipe on generator then schedule 40 pvc to t switch then to main panel. I am talking about either mount under joist or along wall. Someone is telling me all pvc pipe not buried or inside a wall needs to be in schedule 80 because anything visible is subject to physical damage. Is this true?