Turned in a bid for two circuits.....This is the fourth quote Ive done for this client, and they havent done any of them......My "middle man" thinks this one will be too high....what do you think? .......no permits required...
(Circuit 1) 50 cir/ft 1/2 Rigid...straight shot, no bends...20amp 125v...Class1 Div2 area....hang three used/customer supplied expl proof flourescent T8fxtrs....approx 10 pieces of strut 5ft long hung on red iron at 8-10ft high...3 iron T's...up to 4 EYS seals (although I think the fxtrs may have internal seals) which in case only 1 EYS will be needed at classification boundry......1 Switch single pole in exp proof enlosure...Home run is existing
(Circuit 2) 50 cir/ft 1/2 Rigid...straight shot with maybe two field bends....20amp 480v 3ph....Class 1 Div2 area...2 EYS....hanging on strut from item (1) landing into customer supplied starter....home run is also existing
Bid $1800
Material quote was around $500 but I figured 130ft of pipe and wire for cushion...
Thanks for the help....
(Circuit 1) 50 cir/ft 1/2 Rigid...straight shot, no bends...20amp 125v...Class1 Div2 area....hang three used/customer supplied expl proof flourescent T8fxtrs....approx 10 pieces of strut 5ft long hung on red iron at 8-10ft high...3 iron T's...up to 4 EYS seals (although I think the fxtrs may have internal seals) which in case only 1 EYS will be needed at classification boundry......1 Switch single pole in exp proof enlosure...Home run is existing
(Circuit 2) 50 cir/ft 1/2 Rigid...straight shot with maybe two field bends....20amp 480v 3ph....Class 1 Div2 area...2 EYS....hanging on strut from item (1) landing into customer supplied starter....home run is also existing
Bid $1800