Hey group.
I?m bidding a project and here?s the scenario:
Commercial building with a suspended lay-in ceiling. The ceiling space is the return air plenum.
Here is a detail note on the plans that is leaving me scratching my head.
?Duplex receptacle for condensate pump, 1/60th HP, 120V, 1 phase. Provide and install duplex receptacle in a Hoffman box and connect condensate pump without running cord exposed in the air plenum.?
Maybe I?m a little dense but I don?t get what they mean or how to get done per their intent. Can anyone shed some light?
I?m bidding a project and here?s the scenario:
Commercial building with a suspended lay-in ceiling. The ceiling space is the return air plenum.
Here is a detail note on the plans that is leaving me scratching my head.
?Duplex receptacle for condensate pump, 1/60th HP, 120V, 1 phase. Provide and install duplex receptacle in a Hoffman box and connect condensate pump without running cord exposed in the air plenum.?
Maybe I?m a little dense but I don?t get what they mean or how to get done per their intent. Can anyone shed some light?