- Location
- Bremerton, Washington
- Occupation
- Master Electrician
Does the UPC or IPC have requirement for a sign at the power meter if the metal water service line is replaced with plastic?
If you have a UPC or IPC, can you post the language on the above?
If you have a UPC or IPC, can you post the language on the above?
Last edited: