I had a strange situation today. POCO installed the meters in a meter bank for 2 offices. GC said he saw them leave and called me, GC never left the site and when I got there the electric/meter room was locked. Both mains were closed. I have never known POCO to close a customers main, but these were small jobs feed from existing meter banks. I ran this by a couple guys at the shop that do commercial of this scale and they thought it was quite odd also.
Is this common pratice?
Thanks