Our company is about to commence a commercial project where a meter pedestal had been set prior by another contractor specific for this project. It is a 400 amp meter / main pedestal and we will be supplying 2 200 amp panels off it with 300 mcm aluminium conductors following service voltage drop calculation for new building. POCO brought conductors to line side of meter lugs - ran 1/0 AL URD with reduced neutral from their pole underground in 3" conduit to meter pedestal. Our company typically does not work in this POCO's area and we are used of supplying the line side from POCO's pole to meter can - sized per NEC. Should I be concerened about what i see as grossly undersized conductors supplying this service from the pole?