Greetings to all.
Currently, our main electrical service is 38kV, three phase to a 5000KVA transformer. POCO meter is connected measuring two CTs (120A to 5A) and two VTs (38kV to 120V). An opportunity arises since we want to measure the quality of the power, consumed energy, etc from the primary service.
We can connect to POCO meter using KYZ but the data that can be obtained is limited. We are thinking that maybe we can connect to the POCO meter using POCO CTs and VTs. Maybe we can connect the meters in series with the CTs and in parallel with the VTs. Can anyone have performed a connection like this before? Can this connection affect POCO measurements?
Currently, our main electrical service is 38kV, three phase to a 5000KVA transformer. POCO meter is connected measuring two CTs (120A to 5A) and two VTs (38kV to 120V). An opportunity arises since we want to measure the quality of the power, consumed energy, etc from the primary service.
We can connect to POCO meter using KYZ but the data that can be obtained is limited. We are thinking that maybe we can connect to the POCO meter using POCO CTs and VTs. Maybe we can connect the meters in series with the CTs and in parallel with the VTs. Can anyone have performed a connection like this before? Can this connection affect POCO measurements?