O onemetalhead69 Member Location San Jose, Ca, USA Dec 13, 2013 #1 Does anyone know of a conduit chair that will hold the bottom of the pvc conduits (3/4" - 2 1/2") up 4" - 5" off the concrete forms in order to have 1" - 2" separation from the rebar?