Does anyone have a good labor unit for pole bases? I'm looking for a labor unit to include the following.
Dig hole
Set sauna tube
Build rebar cage
Install ground rod
Install PVC stub outs
Pour base
Set anchor bolts
I seem to lose the jobs that have a lot of site lighting to them. I think my estimating program units are to high.