BillyE
New member
- Location
- greenville nc
Does a inspector have to inspect concrete pole base as in see hole depth,rebar cage..before concrete is poured other than inspecting piping depth of 18" ?
There is not a one size fit all answer to that question. Someone should verify the hole depth, concrete strength, bolt length and pattern and steel cage all meet up with manufacturers data for the wind load.Does a inspector have to inspect concrete pole base as in see hole depth,rebar cage..before concrete is poured other than inspecting piping depth of 18" ?
Does a inspector have to inspect concrete pole base as in see hole depth,rebar cage..before concrete is poured other than inspecting piping depth of 18" ?
Code says you can not conceal work until after inspection.
BillyE, you would have to check you local rules or maybe someone from NC can answer.
Does a inspector have to inspect concrete pole base as in see hole depth,rebar cage..before concrete is poured other than inspecting piping depth of 18" ?
The code does not say that. Local rules or laws determine that.
BillyE, you would have to check you local rules or maybe someone from NC can answer.