Jsim4109
Member
- Location
- Cherry Hill, NJ,USA
We have a situation on a jobsite that i need your help. We have installed per the customers request, a utility meter on a pole. The meter is a 200Amp. The source to the meter enclosure is a 120/240 single phase, 3 wire service from the utility. The power leaves the meter enclosure baclk up the pole and extends aerial 50' to the customers building. At the building, the service enters a 200Amp disconnect, the to a load center. We perfomed the bonding at the disconnect/loadcenter area, my question is, does a ground rod and grounding electrode conductor need to be installed at the pole mounted meter enclsoure?