JakeS
Member
- Location
- inland empire
- Occupation
- Inspector 1
I was looking at the bonding on a pool today, the contractor buried the 4 points from the pool shell when they did the shotcrete. Instead of chipping shotcrete away, finding rebar and clamping on at 4 points around the pool the contractor tied the copper around a rock at 4 corners buried it a foot deep compacted the soil in around it then clamped it on to the bonding wire around the pool. It blew my mind, just thought id share.