aftershock
Senior Member
- Location
- Memphis, TN
Existing pool. I cannot find anything in 680 prohibiting me from splicing the #8 bond wire. And as far as conduit depth. I guess table 300.5 does not apply, I must use 680.10 even if a 4" concrete slab is above my 3/4" sch 40 PVC?