resistance
Senior Member
- Location
- WA
If an existing service rated panel served a sub-panel located in a detached structure using an un-insulated EGC. Can that sub-panel serve a remote sub-panel?which will serve a pool? Weak on pools. Lost on 680.25. The Language is confusing me:?