I am wiring in a portable generator to maintain power during an outage. I was going to pull the fuses in the main disconnect to prevent backfeed. wire in the 480v gen. into the load side of the disconnect. Butt splicing into the system nuet. and a seperate but splice for the ground wire. Thus temporarly moving the ground nuet bond to the generator. Is this the correct way to do this? I have never wired in a portable 3 phase genny like this... Any other tips or suggestions would be very appreciated!!!!! Becides checking rotation i do know I need to do that. Thanks guys.