kmass
Member
- Location
- Long Island
- Occupation
- Engineer
Our project involves re-wiring electric to power posts located on a floating dock system. The 600 Amp electric sub-panels (NEMA 4x enclosures) will be located on-land directly adjacent to the gangways leading to the floating docks. Do these sub-panels with NEMA 4X enclosures meet the requirements of section 555.13(B)(4) Portable Power Cables or is another type of junction box with terminal blocks required?