Has anyone had any experience with portable storage units set up for jobsite office space? I recently won a contract on a few hundred of these puppies and was curious as to what class these are considered to be. Also, does anyone have any suggestions as to the most economic way to wire these buildings? The will be studed with metal and all wiring will be concealed. Does anyone see a problem with BX in this application? If sometimes the wiring will be ran externally, must it be ran in EMT, or is BX or other metel flex permissable? Thanks for any help!