electrician installed conduit with service entrance wires straight into the loadcenter on a house, took those thru the loadcenter out to the meterbase line side and then from the meterbase back to the mainbreaker in loadcenter the line and load are in separate flexible conduits i redflagged it, the inspector approved it. i think i'am correct but this inspector thinks he's a genuis. give an answer please