Power Distribution to Multiple panels - OCPD requirements

Status
Not open for further replies.

jfabry

Member
Location
USA
Occupation
Electrical Designer
I have a NEC Code question on the tap rule in which I have read through the NEC240.21 multiple times trying to interpret what is being stated. Looking for some clarification on this forum.

I have an industrial piece of equipment that has multiple panels with one panel (Panel #1) servicing power to other panels on our equipment. In this instance I have 2 panels.

Panel #1 (Main Power Panel)- has 100Amp OCPD

This 100A OCPD is feeding another Panel (Panel #2) that has a Power Distribution Block on it. The conductors are sized appropriately based on the OCPD (100A) feeding this Power distribution block.

Is it a requirement that this panel (Panel #2) have a OCPD prior to the Power Distribution Block? Does the length of the conductors from Panel #1 to Panel #2 also having any outcome in determining the requirement?

Thanks in advance for your review.
 

don_resqcapt19

Moderator
Staff member
Location
Illinois
Occupation
retired electrician
Please clarify your occupation related to this question.
This site is designed for:
  • Electrical Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
* This NEC� Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
 
Status
Not open for further replies.
Top