Is mostly what I did and still do on a consultancy basis.
Today I was assisting a customer work out controls and preparations for a customer witness test on a 4kA 500V 12-pulse rectifier system. I must say they did a pretty professional job on the construction/assembly. My input was just on technical points.


Ignore the temp test wires.
Today I was assisting a customer work out controls and preparations for a customer witness test on a 4kA 500V 12-pulse rectifier system. I must say they did a pretty professional job on the construction/assembly. My input was just on technical points.


Ignore the temp test wires.