When power is needed for a permanent recording 3 phase meter on a panel or switchgear and there is no space for a breaker to feed it, is it acceptable to tap off the buss and install some inline fuses within the gear before leaving the enclosure to the meter enclosure?
The meter enclosure will have a disconnect and OPD within before feeding the meter.
Also would you use a shorting terminal block or shorting switch block for the CT's.
The meter enclosure will have a disconnect and OPD within before feeding the meter.
Also would you use a shorting terminal block or shorting switch block for the CT's.