Power panel has the bottom removed with a grinder and the contractor is mounting this panel flush on the concrete floor.
I have seen this install method with a larger control cabinet sitting on a housekeeping pad, but never a power panel.
Isn't this a violation of 300.10 Electrical Continuity of Metal Raceways and Enclosures?
I have seen this install method with a larger control cabinet sitting on a housekeeping pad, but never a power panel.
Isn't this a violation of 300.10 Electrical Continuity of Metal Raceways and Enclosures?