We are working in a 5 story apartment building on the first floor of which is going to be a new pizza restaurant.
Question: We have to power up the make up air & intake on roof for ansul hood system. The only way to roof is though an exsting 2 " emt conduit already installed in concrete. I know code says you are allowed to run type MC cable (10_3) (2) through conduct used as a sleeve, however since there is no way to support mc (5 floors) because its inside conduit will inspectors allow this? And does conduit sleeve have to be grounded? My feeling on this is I should be able to fish MC down conduit sleeve from roof with supports or grounding conduit since mc is its own entity???
We are working in a 5 story apartment building on the first floor of which is going to be a new pizza restaurant.
Question: We have to power up the make up air & intake on roof for ansul hood system. The only way to roof is though an exsting 2 " emt conduit already installed in concrete. I know code says you are allowed to run type MC cable (10_3) (2) through conduct used as a sleeve, however since there is no way to support mc (5 floors) because its inside conduit will inspectors allow this? And does conduit sleeve have to be grounded? My feeling on this is I should be able to fish MC down conduit sleeve from roof with supports or grounding conduit since mc is its own entity???