Is there an NFPA requirement for a purged air system in a Class 1 Div 2 panel? I am installing an outdoor panel in an areas normally without hazardous air and am considering using a Type Z system. I am receiving pressure to reduce costs and am reviewing all costs for savings.
Is there an NFPA requirement for a purged air system in a Class 1 Div 2 panel? I am installing an outdoor panel in an areas normally without hazardous air and am considering using a Type Z system. I am receiving pressure to reduce costs and am reviewing all costs for savings.